Standard Swedish standard · SS-EN 16907-3:2018

Earthworks - Part 3: Construction procedures

Status: Valid

Buy this standard

Standard Swedish standard · SS-EN 16907-3:2018

Earthworks - Part 3: Construction procedures
Subscribe on standards - Read more Dölj
Price: 1 731 SEK
standard ikon pdf

PDF

Price: 1 731 SEK
standard ikon

Paper

Price: 2 769,60 SEK
standard ikon pdf + standard ikon

PDF + paper

Show more Show less
Scope
This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes excavation and placement of rock materials underwater.
Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and EN 16907-7.
Execution of earthworks follows the conclusions of the earthworks design and optimization phase (EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.

Subjects

Earthworks, excavations, foundation construction, underground works (93.020)


Buy this standard

Standard Swedish standard · SS-EN 16907-3:2018

Earthworks - Part 3: Construction procedures
Subscribe on standards - Read more Dölj
Price: 1 731 SEK
standard ikon pdf

PDF

Price: 1 731 SEK
standard ikon

Paper

Price: 2 769,60 SEK
standard ikon pdf + standard ikon

PDF + paper

Show more Show less

Product information

Language: English

Written by: SIS - Bygg och anläggning

International title:

Article no: STD-80008564

Edition: 1

Approved: 12/12/2018

No of pages: 96